Fungicides – Foliar Treatment
501
•
Safety - page 25 • First aid - page 33 • Resistance management - page 41
Lance WDG
Group 7
Formulation
Product
Company
Active ingredient
Formulation
Container size
Lance (PCP# 27495)
BASF Canada Boscalid: 70%
Wettable granules
2.83
kg
Crops, Diseases Controlled, Rates and Timing
Crop
Diseases
Rate per acre
Staging and specific comments
Field crops
Alfalfa (seed
production only)
Blossom blight (
Sclerotinia Botrytis
cinerea sclerotiorum
),
common leaf spot
(
Pseudopeziza medicaginis
),
spring black
stem (
Phoma medicagnis
),
leaf spot
(
Leptosphaerulina briosiani)
170
g
Apply at 20 - 50% flowering to control
blossom blight, common leaf spot and
spring black stem. Apply every 7 - 14 days
if disease persists or weather conditions are
favourable for disease development. Do not
make more than 3 applications per season.
Canola, mustard
(
oilseed and
condiment),
CLEARFIELD XCEED
Sclerotinia stem rot (
Sclerotinia
sclerotiorum
),
black spot (
Alternaria
brassicae
and
raphani)
142
g
Apply at 20 - 50% flowering to control
sclerotinia stem rot and suppress black
spot. Apply a second time 7 - 14 days
later up to full bloom if disease persists
or weather conditions are favourable
for disease development. For control of
alternaria black spot, apply at late flowering
to the early green pod stage. Do not make
more than 2 applications per season.
Chickpea and lentils
Ascochyta blight** (
Ascochyta
spp.),
gray mold (
Botrytis cinerea
),
white mold
(
Sclerotinia sclerotiorum
)
170
g
Apply at the beginning of flowering.
Apply a second time 7 - 14 days later if
disease persists or weather conditions are
favourable for disease development. Do not
make more than 2 applications per season.
Dry beans, faba beans
White mold (
Sclerotinia sclerotiorum
)
227 - 312
g
Apply at 20 - 50% flowering. Apply a second
time 7 - 14 days later if disease persists
or weather conditions are favourable for
disease development. Use the higher rate to
obtain extended protection and maximum
yield benefit. Do not make more than 2
applications per season.
Peas (dry)
Ascochyta blight (
Ascochyta
spp
.
)
gray
mold (
Botrytis cinerea
),
Mycosphaerella
blight (
Mycosphaerella
spp.)
170
g
Apply at the beginning of flowering.
Apply a second time 7 - 14 days later if
disease persists or weather conditions are
favourable for disease development. Do not
make more than 2 applications per season.
Potatoes
Early blight (
Alternaria solani
)
70 - 126
g
Apply prior to disease development and at
14
days intervals. Do not make more than
4
applications per season.
Late blight (
Phytophthora infestans
)
70 - 126
g
Lance must be tank mixed with either
Polyram DF or Bravo 500 at label rates for
control of late blight. Apply prior to disease
development.